Build to print
You send the drawings and we build the panel to match them. If something on the print doesn't add up, we call you before we cut wire.
Outsourced UL 508A panel builds for OEMs
We take industrial control panel builds off the plates of equipment builders and plant owners. Panels are built to UL 508A in listed partner shops. Send us your schematics and BOM. We review them, quote the build, and every panel is tested before it ships.
Prefer to talk first? Call [PHONE TBD]
Capabilities
You send the drawings and we build the panel to match them. If something on the print doesn't add up, we call you before we cut wire.
Panels are built and documented to UL 508A in listed partner shops. We check SCCR, wire sizing, and component spacing against the standard, so the label and nameplate hold up at inspection.
We go through your schematics, layout, and BOM before we quote. Typical catches: an undersized feeder, a component with no SCCR rating, or a part with a 20-week lead time.
No drawings yet? Send an I/O list and a sequence of operation. We can draw the panel for your review and approval before anything gets built.
Every panel gets a point-to-point wiring check and a power-up test. If you send PLC code, we can load it and check the I/O before the panel goes on the truck.
Partner shop credentials
We manage your panel from drawings to delivery. The build itself happens in partner fab shops that hold the credentials below. These are our build partners' credentials, not Outsourced Controls' own. Ask which partner will build your panel and which of these apply to it.
Credentials vary by partner shop and by job. Standard and certification names belong to their owners; no logos are shown.
Your engineers should be designing machines, not chasing parts and wiring panels. Hand us the drawings. We handle layout, purchasing, wiring, and test. You get a panel that matches the print and is ready to mount.
Building the same panel over and over? Ask about pricing for repeat builds. How OEM builds work.
A UL 508A labeled panel is easier to get past an inspector. The label and the SCCR on the nameplate answer most of the questions before they get asked.
Each panel ships with as-built drawings, so your maintenance team isn't guessing three years from now.
Process
Schematics, layout, and BOM. PDF, DWG, and DXF all work. A partial package is fine to start.
We mark up anything that looks wrong and send a quote with price and lead time.
Approved drawings go to the floor. The panel is tested, labeled, and shipped with as-built drawings.
Markets
Don't see your industry? If it runs on a control panel, send the drawings and we'll take a look. More on industries.
Work
We're adding project profiles. Each one will show the panel, the spec it was built to, and what the customer needed.
Our guidebook covers what the standard applies to, how SCCR is worked out, and what to have ready before an inspection.
UL 508A is the UL standard for building industrial control panels. A shop listed under it can put the UL label on panels it builds and documents to the standard. Many inspectors and end customers ask for that label.
Outsourced Controls doesn't hold a UL 508A listing itself. Your panel is built in a UL 508A-listed partner shop, and that shop applies the label.
Schematics, a BOM, and a panel layout if you have one. Add the quantity, the date you need it, and any customer specs. If all you have is a sketch or an I/O list, send it anyway.
Parts usually set the schedule more than shop time does. Drives, PLCs, and some enclosures can take weeks to arrive. Your quote will list a lead time based on current part availability.
Yes. We build to the parts you specify. If a part is long-lead or obsolete, we suggest an alternate and wait for your OK before swapping anything.
Tell us where the panel is going and we will include freight in the quote.
Yes. Send your NDA with the quote request, or ask for ours.
Fill this out and attach what you have. We'll review it and get back to you with questions or a quote. Need to add shipping details or panel type? Use the full quote form.