DDC field panels
Controller, expansion I/O, 24 VAC transformers, relays, and terminals in a single enclosure for an air handler, a floor, or a mechanical room.
Building automation
Field panels for building automation, built to your points list and the controller your project specifies. Every terminal labeled, every wire numbered, and the panel tested before it ships, so your field crew lands wires instead of building panels in a mechanical room.
Send us your points listBuilt in UL 508A-listed, ISO 9001 partner shops. cUL and CSA labeling available through partner shops.
Controller, expansion I/O, 24 VAC transformers, relays, and terminals in a single enclosure for an air handler, a floor, or a mechanical room.
Supervisory controllers, routers, switches, and protocol gateways for BACnet/IP, BACnet MS/TP, and Modbus.
Panels for air handlers, pumps, and fans, with drives and starters in the same enclosure or a matched pair. See HVAC and AHU panels.
Chiller, boiler, and cooling tower sequencing. See chiller and boiler panels.
Energy meters, CTs, and shorting blocks with network connections into the BMS.
Relay panels with BMS or schedule control for lighting circuits.
We build the panel. Programming the controller stays with your BMS team unless we agree otherwise.
An enclosure that holds the building automation controller and everything it needs: I/O, power, relays, network gear, and the terminals field wiring lands on. It reads sensors, runs the sequence, and drives dampers, valves, and fans. Our guide to BMS panels goes deeper.
We build to the controller your project specifies, including Tridium Niagara, Distech, Johnson Controls, Siemens, Honeywell, Automated Logic, and PLC-based systems. Send the model numbers with the points list.
Yes. That's the most common way these come in. If the schedule and the sequence don't agree, we flag it before we build.
Yes. They're built to UL 508A in listed partner shops, which is what most specs and inspectors ask for. Some building automation specs call for UL 916 (energy management equipment) instead. Check which one your spec names and tell us at quote time.
Controllers and enclosures usually set the date. Your quote lists a lead time based on current availability. If you're on a tight job schedule, tell us the date the panels need to be on site.
Yes. For a multi-panel job we build to one standard layout per panel type and ship in the order your site needs them.
Send the points list and panel schedule. We'll quote the panels.