Control panels built to your drawings in UL 508A-listed partner shops

Services

What we do

We manage industrial control panel builds to your drawings. Panels are built to UL 508A in listed partner shops. Around that we review your package, buy the parts, test the panel, and send it with the paperwork your team needs to install and maintain it.

Send us your drawings

Built in UL 508A-listed, ISO 9001 partner shops. cUL and CSA labeling available through partner shops.

  • UL 508A
  • cUL
  • CSA
  • UL 698A
  • UL 1203
  • ISO 9001
  • Lean
Partner shop credentials

Build to print

You send schematics, a layout, and a BOM. We build the panel to match them: back panel drilled and tapped, devices mounted, duct and rail cut, every wire numbered at both ends. If something on the print doesn't work, like a part that won't fit the layout or a wire size that doesn't match the breaker, we call you before we change anything.

Drawing and BOM review

Before we quote, an engineer goes through the package. Common catches:

  • A component with no short-circuit rating that would drag the panel SCCR down
  • Feeder or branch conductors sized for the load but not for the terminal temperature rating
  • A layout that doesn't leave door clearance or room for heat from drives and power supplies
  • Parts that are obsolete, on allocation, or months out
  • Enclosure type that doesn't match where the panel is going

You get a marked-up set with the issues and our suggested fixes. Nothing changes without your OK.

Design help

No drawings yet? Send what you have: an I/O list, a sequence of operation, a motor list, or a sketch on a napkin. We can draw the schematics and panel layout, size the protection and wiring, and pick parts, then send the set to you for approval before anything gets built.

Parts and purchasing

We buy everything on the BOM, track the long-lead items, and tell you early if something slips. If you have distributor accounts or pricing you want us to use, put them on the quote request. If you'd rather supply some parts yourself, such as a PLC you already own, we can build around free-issue parts too.

Testing before ship

Every panel gets a point-to-point wiring check against the drawings and a power-up test. If you send PLC code, we can load it and check I/O before the panel leaves. Want to see it run? Ask about a witnessed factory acceptance test at quote time.

Documentation

Panels ship with as-built drawings that match what's in the box, the BOM with maker part numbers, and the test record. If your project has its own submittal or turnover requirements, send them with the quote request.

Panel modifications and upgrades

Adding a drive, swapping an obsolete PLC, or bringing an old panel up to date? Send photos and whatever drawings exist. We'll tell you what the change does to the SCCR and the labeling before we quote. Some changes can be done on the existing panel; others make more sense as a new build.

Repeat builds

Building the same panel over and over? We lock the drawing revision, build a first article for your approval, then build to that. Ask about per-unit pricing and stocking for repeat builds. More on how that works on the OEM outsourcing page.

Panels we build

BMS and DDC panels

Field controller panels for building automation, built to your points list and BMS platform.

HVAC and AHU panels

Air handler, rooftop unit, and fan control panels, with VFDs mounted and wired.

Partner shop credentials

Built in qualified partner shops

We manage your panel from drawings to delivery. The build itself happens in partner fab shops that hold the credentials below. These are our build partners' credentials, not Outsourced Controls' own. Ask which partner will build your panel and which of these apply to it.

  • UL 508AIndustrial control panels, built in UL 508A-listed partner shops
  • cULcUL labeling for Canadian sites, available through partner shops
  • CSACSA labeling available through partner shops
  • UL 698AHazardous-location panels (industrial control panels relating to hazardous locations) through qualified partners
  • UL 1203Explosion-proof and dust-ignition-proof enclosures through qualified partners
  • ISO 9001Partner shops run ISO 9001 quality management systems
  • LeanPartner shops run Lean production

Credentials vary by partner shop and by job. Standard and certification names belong to their owners; no logos are shown.

Have a package ready?

A partial set is fine to start. We'll tell you what's missing.

Send us your drawings
Send us your drawings