Control panels built to your drawings in UL 508A-listed partner shops

Data centers

Data center control panels

Controls panels for cooling plants, CRAH units and fan walls, liquid cooling, and monitoring. These jobs come with tight schedules, high fault current, and a commissioning team that reads every drawing. We build for that.

Send us your drawings

Built in UL 508A-listed, ISO 9001 partner shops. cUL and CSA labeling available through partner shops.

  • UL 508A
  • cUL
  • CSA
  • UL 698A
  • UL 1203
  • ISO 9001
  • Lean
Partner shop credentials

What we build

Cooling plant controls

Chiller, pump, and cooling tower sequencing panels, often with redundant controllers and power supplies. See central plant panels.

CDU and liquid cooling panels

Controls for coolant distribution units: pump drives, flow, pressure, and temperature monitoring, leak detection inputs, and BMS communication.

CRAH and fan wall panels

Fan arrays with multiple drives, airflow control, and integration to the building automation system.

Monitoring and BMS panels

Controllers, I/O, and network gear for the BMS and power monitoring, laid out for clean cable management.

Remote I/O panels

Distributed I/O near the equipment, tied back over redundant networks where the design calls for it.

Repeat builds across buildings

The same panel for every hall or every building, built to one approved revision so commissioning goes the same way each time.

What data center panels need

  • High SCCR. Large services mean high available fault current. We need that number at quote time to pick the right parts.
  • Redundancy that's actually redundant. A/B power feeds, redundant power supplies, and controller redundancy laid out so one failure doesn't take out both paths.
  • Network design. Separate, labeled networks for controls and monitoring, with the switch configuration documented.
  • Documentation. As-built drawings, BOM, and test records that match the panel and hold up in commissioning.

Send us this

  • Drawings or a panel schedule and points list
  • Available fault current at each panel's feed
  • Controller and network standards for the site
  • Quantity, ship dates, and the delivery sequence by building or hall
  • Commissioning or witness-test requirements

Data center panel questions

Do you build CDU control panels?

Yes. We build CDU controls panels to the CDU maker's or the engineer's drawings: pump drives, sensors, leak detection inputs, and communication to the BMS.

Can you witness-test panels with the commissioning agent?

Ask at quote time. We'll set up a factory test the commissioning agent can witness in person or by video.

Can you match our site standard?

Yes. Send the owner's controls standard and we'll build to it, including wire colors, labeling, network addressing, and approved parts.

Data center panels to quote?

Send the drawings and the available fault current.

Request a quote
Send us your drawings