Control panels built to your drawings in UL 508A-listed partner shops

LNG and Gulf Coast work

LNG balance-of-plant panels

On an LNG job, the core control system usually belongs to the main automation contractor or the liquefaction vendor. The work we quote sits a tier below that: balance-of-plant control panels and related cabinets, built to your drawings.

Send us your drawings

Built in UL 508A-listed, ISO 9001 partner shops. cUL and CSA labeling available through partner shops.

  • UL 508A
  • cUL
  • CSA
  • UL 698A
  • UL 1203
  • ISO 9001
  • Lean
Partner shop credentials

What this page is for

This is for EPC package leads, E&I contractors, and instrumentation or procurement people who need cabinets built to an issued package. We do not bid to replace the main automation contractor, and we do not redesign the plant DCS.

We build instrument air, fuel gas, nitrogen, water treatment, boil-off gas, and low-voltage MCC lineups, plus compressor and metering panels for feed-gas pipelines when those packages are issued as build-to-print.

If you already have a drawing package, send it. We will tell you what we can build and what we still need.

Panels we quote on this kind of job

Instrument air and dryer packages

Control panels for instrument air compressors, dryers, and related utility skids, built to the issued package.

Fuel-gas and nitrogen packages

Package panels for fuel-gas and nitrogen systems, wired to your schematics and layout drawings.

Water-treatment and utility panels

Utility and water-treatment controls that sit beside the liquefaction train, not inside it.

Boil-off gas packages

Boil-off gas package panels built to the documents you release.

Compressor and metering stations

Compressor and metering-station panels on feed-gas pipelines, when the package is issued as build-to-print.

If your package uses a different name, send the drawings anyway. We quote from the documents, not from the title block.

Labels and shop credentials

Outsourced Controls does not hold a UL 508A listing, or CSA, cUL, UL 698A, UL 1203, Lean, or ISO 9001 credentials of its own. Panels are built in partner fab shops that can carry those credentials.

Hazardous-location panels can be built in partner shops under UL 698A, with UL 1203 enclosures when the package requires explosion-proof or dust-ignition-proof equipment. UL/cUL/CSA labels are available through those shops. ISO 9001 and Lean apply to the partner shops, not to Outsourced Controls as a listed company. We match the shop and the label to the package you send.

What to send

  • Schematic and layout drawings (PDF, DWG, or DXF)
  • Point list or I/O list, if the cabinet includes marshalling or remote I/O
  • Preferred components, if the owner or EPC has already specified them
  • Enclosure rating and any hazardous-location requirements
  • Quantity, and whether later units should match a first article
  • Ship-to location and the date you need it on site or at the yard

Upload files on the quote form or paste a shared-folder link. You can also email prints to paultables@outsourcedcontrols.com.

How a quote works

  1. You send drawings, a bill of material if you have one, quantity, need-by date, and the ship-to yard or jobsite.

  2. We review the package for manufacturability and for the labels the documents call for, including UL 508A work in partner shops and hazardous-location requirements such as UL 698A or UL 1203 enclosures, then come back with questions and a price.

  3. After you release the work, we build, test, document, and ship to the site or staging yard you name.

Lead time depends on the package and on parts. The quote will include a date.

Questions about LNG balance-of-plant work

Do you have a shop in Louisiana?

We quote and ship to Louisiana jobsites and yards. We do not list a local storefront on this page. If you need a street address for a bid form, ask us and we will tell you what we can publish.

Will you build the plant DCS or the liquefaction train controls?

No. That work belongs to the main automation contractor or the train vendor. We build the cabinets under that scope, or the utility and pipeline packages beside it.

Do you work only in Louisiana?

No. This page is written for Gulf Coast LNG work because that is where a lot of packages are being issued. The same build-to-print process applies to other ship-to locations.

Do you hold a UL 508A listing?

No. Outsourced Controls does not hold a UL 508A listing. Panels are built in partner fab shops that do. UL/cUL/CSA labels are available through those shops. Hazardous-location work can use UL 698A and UL 1203 enclosures, also through partners. ISO 9001 and Lean are partner-shop credentials, not ours. We will not print a file number here.

Related: build-to-print and OEM programs · panel types · what we do · marshalling and remote I/O

Have an LNG package to quote?

Send the drawings, the ship-to yard or jobsite, and the date you need the panels.

Send us your drawings
Send us your drawings